A14v85
File: "/MZ/A/A14/D/V/0085.htm".
Processed on 2022-10-27.
Roster |
Date |
Author |
Record |
Description (summary) |
2003-08-30 |
jl |
This is our daily view of k12. Today, we will finish leveling f137, the east baulk, and then begin excavating f141, the northern baulk. [Input: N830JL.j] |
Roster |
Date |
Author |
Record |
Template |
|
View/drawing of aggregate |
2003-08-13 |
jl |
a8 (pit) [Input: N908JL.j] |
View/drawing of features |
2003-08-13 |
jl |
f14 (structure), f20 (wall), f31 (structure), f33 (accumulation D), f42 (accumulation D), f43 (accumulation D), f88 (accumulation C), f89 (wall), f99 (accumulation A), f129 (accumulation D), f137 (accumulation D), f141 (topsoil), f142 (accumulation D) [Input: N908JL.j] |
View/drawing of locus |
2003-08-13 |
jl |
k1, k2, k3, k11, k12, k13 [Input: N908JL.j] |
View/drawing orientation |
2003-08-13 |
jl |
looking north [Input: N908JL.j] |