.bk A15 .fl ZG124jW.j .fd types of contact for MZ15N MZ14(2001-L) .fn k91, k92, k93, k94, k100 for MZ14N okk .ei jW .ed ZG124 .rd ZG123 .ri jw f 222 tc re f221 tc re f216 tc ab f528 nv The south end of this wall (foundation) was not excavated to its bottom. Therefore its stratum is problemetical. It was either constructed at the same time as the formal courtyard or alternatively constructed after the reception area began to be used. The wall it supported was likely just a few courses high and provided a frame for the entrance. f 223 tc cu f554 f 108 tc co f134 f 134 tc ab f136 f 141 tc co f146 f 148 tc co f205 f 205 tc co f176 f 146 tc co f226 f 106 tc ab f105 tc ab f206 f 64 tc ab f65 tc ab f84 tc ab f60 f 54 tc co f39 tc co f64 f 64 tc ab f85 tc ab f65 f 76 tc ab f77 f 84 tc ab f87