.bk A20 .fl U922lC1.j .fd Daily .ed U922 .ei lC .rd U922 .ri lC -sg Today fAB came early in the morning to A20 and we decided to remove the baulks between k24 and k25, k24 and k34, and the two baulks between k14 and k15 (excavated in 2008) and the new loci k24 and k25. This will allow us to link the sloping layer f192 and f197 and take a nice picture. Moreover it will link the old excavation with the new squares and will probably let us to find the crest and the northern face of ^wall1 and the possible wall running north to south and badly damaged by the pit f189. -dy Today, after the drawings of the sections were completed, we started to remove the northern baulk of k24 with the f200 to link layer f192 to f197. We also removed the baulk between k14 and k24 looking for the upper part and the northern edge of ^wall1 but we were not able to reach that level. We also draw the west section of k25 because it shows the pit cutting the earlier structures. k 14 dy Today we removed the northern baulk of 14 in order to find the upper part and the northern face of ^wall1 k 24 dy Today we drawn the north section and then we removed the baulk to have a wide view of the area and to take a nice picture showing the layer f192 and f197. .rd U923 -dy Today we started to remove the baulk between k24 and k25 and between k15 and k25. This will allow us to have a better understanding of the whole easterna area of A20. We expect to find the southern edge of the vertical mudbrick installation and western edge of the pit f189, probably cutting the possible wall running north to south. Before to look for the western face of this wall, the sides of the pit could help us to identify some mudbrick, showing the presence of the wall. k 24 dy Today we removed the eastern baulk to look for the upper part of the possible wall running north to south and bonded to ^wall1. Removing this baulk we also expect to find the western adge of the big pit f189. k 15 dy Today we started to remove the northern baulk looking for the edge of the vertical mudbrick installation and for the probable continuation of the stone pavement f57 excavated in 2008. .rd U924 -dy Today, even being Friday we worked in the morning in the field. We finished to remove the north baulk of k15 founding more stones belonging to the pavement f57 going under the vertical brick installation f191. We also finished to remove the pit filling f180 and then we started to clean k24 to prepare it for the picture of tomorrow.