.bk J01 .fl P906ms.j .fd daily journal .fn R129 gB corrected ph1 to h1-JPA - It could also be changed to "phase 1" in which case no hyperlink is created .ei mS .ed P906 .rd P906 .ri mS -dy found the bottom of the wall, the goal of the season, after excavating only a few cm this morning. There seems to be no foundation trench but only a soft glacis. We will cease excavating in this locus and excavate one meter to the west. k 103 dy found the bottom of the wall, f72 after excavating only a few cm this morning. The bottom elevation is 8675. We finished f195 which was the ashy layer and declared f196 which was a clean brown layer. After reaching the bottom of the wall, we see in section that this brown layer is most likely the glacis at the base of the wall. The ash is the occupation layer above it. mKB has dated the pottery from both f195 and f196 as h1-JPA. f 195 ds further excavation shows that this ashy layer is the first accumulation above the glacis of the wall, f72. f 72 ds this is the large wall and the bottom elevation is 8675 so it is only 3 meters high. a 3 ds this is the large wall and the bottom elevation is 8675 so it is only 3 meters high.