includes other label | 2021-3-07 | jW | ^EDIIIinstal | [Input File: ZF307jW.j] |
category | !! | !! | buildup | [Input File: !!] |
definition (typological label) | 2005-9-06 | rE | packing | [Input File: P918jW3.j] |
summary | 2012-10-07 | jW | Vertical baqaya plaster coating in k105 applied to the inside surface of EDIII revetment wall f11. | [Input File: Wx07jW1.j] |
best image | !! | !! | ![]() v29 |
[Input File: !!] |
description (summary) | 2005-8-29 | jW | Vertical layer of bakhia packed and plastered between stones of the f11 wall, in k104/105, probably for the purpose of sealing the wall and regulating the passage of moisture from the packing behind to the front surface. | [Input File: Q302jW2.j] |
best view | 2006-4-20 | jW | v46b | [Input File: Q420jw1.j] |
m#/elev @top | 2005-9-06 | rE | m4073 | [Input File: P918jW3.j] |
height @top | 2005-9-06 | rE | 47 | [Input File: P918jW3.j] |
h-eye @top | 2005-9-06 | rE | 163 | [Input File: P918jW3.j] |
m#/elev @bottom | 2005-9-06 | rE | m4241 | [Input File: P918jW3.j] |
height @bottom | 2005-9-06 | rE | 37 | [Input File: P918jW3.j] |
h-eye @bottom | 2005-9-06 | rE | 164 | [Input File: P918jW3.j] |
type of contact: latest events | 2005-8-22 | rE | f11 (wall) abuts f80 (packing) | [Input File: P824gM.j] |
type of contact: contemporary events/movable items | 2005-9-08 | jW | q144 (items--pottery, bones) sits in f80 (packing) | [Input File: P918jW1.j] |
2005-9-18 | rE | f80 (packing) bonds with f11 (wall) | [Input File: Q301jW.j] | |
2005-9-08 | jW | q144.1 (soil) sits in f80 (packing) | [Input File: P918jW1.j] | |
2005-9-08 | jW | q144.2 (soil) sits in f80 (packing) | [Input File: P918jW1.j] |
stratum (to which element belongs) | 2012-9-09 | jW | s650dJ3B | [Input File: W909jW.j] |
stratigraphic reasons of assignment | 2006-4-26 | jW | Bonded to monumental wall f11. | [Input File: Q426jW.j] |
2012-10-07 | jW | Baqaya plaster vertical surface bonded to the EDIII revetment wall f11. | [Input File: Wx07jW.j] | |
typological reasons for assignment | 2012-10-07 | jW | This plaster, bonded to the north face of the revetment wall, f11, stones was clearly used in its construction | [Input File: Wx07jW.j] |
other reasons, reservations, qualifications | 2006-4-26 | jW | Water permiable plaster applied to back of wall just after the stones were laid. | [Input File: Q426jW.j] |
phase (to which element belongs) | 2012-9-09 | jW | h3mJ3B | [Input File: W909jW.j] |
strata (included within phase) | 2012-10-07 | jW | s650dJ3D | [Input File: Wx07jW.j] |
color | 2005-9-06 | rE | reddish yellow | [Input File: P918jW3.j] |
color number (Munsell) | 2005-9-06 | rE | 5YR 6/6 | [Input File: P918jW3.j] |
view/drawing of features |
|