.bk J03 .fl Q821vE.j .fd daily journal of J03 East .fn edited by eI on R815 and jW on R922 .ri vVE .rd Q821 .ed Q821 .ei vVE -dy k2 and k107 were photographed today. The N-section of k106 was drawn by mO and eI. The north baulk of k1 was removed. f523 is the top soil of this baulk and f558 the deposit under the top soil that had already been excavated in previous years when k1 was part of J2. After having removed f558 we came upon f500 once more and this deposit was also excavated. The general outline of the steps of f556 were relayed. All the loci were cleaned because last night a storm had blown dirt everywhere. k 1 dy We started to remove the Northern baulk of k01. f523 was the top soil (nothing was collected) and f558 the underlying natural accumulation. This underlying accumulation had already been excavated in the rest of the locus during one of the previous campaigns as part of J2. After having removed f558 we reached f500 which was also excavated. f 558 ds Natural accumulation, f558, under the top soil f523 of the northern baulk of k1. The corresponding deposits in the 4x4 m. excavation area had already been removed during a previous campaign when k1 was part of J2. f558 lies on top of f500. tc co f500 f 523 ds Top soil, f523, in the Northern baulk of k1 which covers the natural accumulation of f558. tc co f558 f 500 dy Today more of the natural deposit f500 was excavated when we removed the northern baulk of k01. During the excavation of f500 we partially uncovered the large boulders f529 and f530.