.bk J05 .fl T824jW.j .fd Daily journal for T824 .ei jW .ed T824 .rd T824 .ri jW -wk A crew of nine (four picks and five removal) reported. -sy On T823, aAJ took 17 relays and 24 elevations on various features and loci. f 286 sg PROPOSED ACTION: We will make a small 50cm-wide probe to the north from the stairs of f205 to the stone structure, f194, just to the west of stones, f276.
PURPOSE: The purpose is to see how these features are related and their place in the stratigraphic sequence. f 287 sg PROPOSED ACTION: We will remove accumulation, f282, to the south of the southernmost line of exposed stones in the first escarpment, ^esc1.
PURPOSE: To see if there is another row of stones to the south and if not, what does abut the escarpment. f 284 sg PROPOSED ACTION: We will excavate a narrow channel of soil, f288, between f189 and f284.
PURPOSE: To determine the relationship between the northenmost line of the stones of ^esc1 and the line of stones, f284, beneath the revetment wall, f189. f 265 sg PRPOPOSED ACTION: We must remove the remaining western part of wall, a11, namely f255 and f260 and excavate the accumulations underneath to the level of ^esc1.
PURPOSE: To determine what happens to the first escarpment, f265, as it follows wall, f41, to the north. Is it similar to f225 and f184 or does it change to a stone pavement extending to the west from f41? -sg Two additional tasks were added to the four specific investigations (f265, f284, f287, f286) proposed by gB, fAB and the unit staff. First, we need to remove stone, f275, upon which the shafat sits. then excavate the accumulation below, f289.
Second, we need to remove a small baulk on the west end of the north face of k100 to improve the sightlines into the excavation so that ^esc1 can be safely viewed from above.