.bk J02 .fl O725ap1.j .fd daily journal .rd O724 .ri aP .ed O725 .ei aP -sy also if it's Saturday Gb decided to call some of the workmen with the goal of finishing as soon as possible to remove the baulks and to clean the dirt. For this reason a bigger machine from Sabbah was assembled in the eastern part of the German trench. Since I was sick I stayed on the field just for the first two hours. k 3 dy we went on, continuing to remove the eastern baulk of k3 (f92, q243), and removing the columns of soils on which the eroded stones were placed (f90, q241). k 13 dy we went on removing the columns of soils on which the eroded stones were placed (f91, q242) and removing soil in the western of the square (f41, q245). k 93 dy we are removing the eastern baulk of k93 (f88, q244).