.bk J02 .fl P909mH.j .fd q log q424-q523 .ed P829 .ei jK .rd P810 .ri mH q 410 p 158 5 r483 175E 350S m3967 159 142 10 removing f158 E half of the area 411 i 159 14 r484 30S 40E m3964 19 155 3 sample of f159 to be analyzed 412 i 159 14 r485 30N 40E m3964 17 155 3 sample of f159 to be analyzed 413 i 159 14 r486 30S 40E m3967 99 155 3 sample of f159 to be analyzed 414 pbi 159 14 m3964 400E 300N m3964 18 155 10 excavating f159 with big pick 415 pbi 159 14 m3964 400E 300N m3967 92 155 10 excavating f159 with big pick 416 p 158 5 m4037 30E 400S m3967 158 142 30 f158 is mixed with f157 Barbara set the real margin of k5 with 4 new markers therefore we had to move approximately 30cm in the W margin and 20 cm on the N margin and 30 cm on the E margin of k5 417 p 158 5 m4037 15S 400E m3967 156 142 30 f158 is mixed with f157 Barbara set the real margin of k5 with 4 new markers therefore we had to move approximately 30cm in the W margin and 20 cm on the N margin and 30 cm on the E margin of k5 418 p 158 5 m4038 30W 400S m3967 157 142 30 f158 is mixed with f157 Barbara set the real margin of k5 with 4 new markers therefore we had to move approximately 30cm in the W margin and 20 cm on the N margin and 30 cm on the E margin of k5 419 pb 159 14 m3964 400E 300N m4032 97 142 10 continuing down in the hard layer 420 pb 159 14 m3964 300N 400E m4032 80 146 10 continuing excavating k14 421 p 160 5 m4037 300E 100N m4032 140 146 30 baulk N k5 (see q418) comment 422 p 158 5 m4038 30W 400S m4037 157 142 30 continuing excavation of k5 (see q418) 423 pbi 161 14 m3964 400E 300N m3967 54 146 10 excavation by big pick 424 p 158 5 wk m4035 75 146 10 Going down in the whole unit. .ri sC 425 p,b 161 14 m3964 400e 300n m3967 44 146 10 Excavating with a big pick. .ri vVE 426 p 158 5 wk m3967 135 146 10 Because q424 was full. 427 p 162 14 m4032 300n 260w m4032 53 146 10 Softer layer. .rd P811 .ri vVE 428 p,b 162 14 m3964 200e 300n m4030 158 153 10 Excavating with a big pick. Western half of the unit. 429 p,b 158 5 r487 170s 400e m4035 63 153 19 Excavating with a big pick. Southern half of the whole unit. 430 p 158 5 m4051 400e 25s m4035 82 153 10 Excavating with a big pick. Removal of dirt left standing again in the N baulk. 431 p 163 5 m4035 400e 45n m4039 127 138 50 Excavating with a big pick. Removing the ledge. .ri sC 432 p 153 100 20 Collapsing E baulk of k100, excavated with a big pick. .ri aL 433 p,b 162 14 m3964 300n 400e m4031 154 138 10 Continuing excavation. .ri vVE 434 p,b 158 5 m4035 400n 400e m4035 138 Continuing exvavation with a big pick. .ri mH 435 p,b 162 14 m3964 300n 400e m4032 21 137 Leveling to match k13. .rd P813 .ri sC 436 p 158 5 m4039 100w 400n m4035 72 153 15 Finish excavating area with a big pick. 437 p,b 164 5 m4035 400n 400e m4035 54 153 20 Excavating the whole square with a big pick. .ri aL 438 p 165 101 m3953 200n 200e m3953 121 153 15 Removing baulk of k101. 439 p,b 140 13 m4030 180w 230n m3953 103 153 5 Removing f140 (contaminated layer) 440 p,b 166 101 m3953 200n 200e m3953 100 153 Excavating f166 (contaminated layer). .ri sC 441 p 167 102 m4064 300w 400s m3814 142 153 10 Start excavating k102. 442 p 166 101 m3965 200n 200e m3965 114 153 13 Continuing excavating f166. 443 p,b 140 13 m4030 180w 230n m3953 109 153 5 Excavating with a big pick. In the NW corner of k13 we found seeds and gypsum abutting f128 and on the NE corner gypsum was found close to f127. 444 p,b 164 5 m4035 400n 400e m4035 42 153 9 Excavating with a big pick. 445 p,b 166 101 m3965 200e 200n m3965 101 152 4 Continuing excavating f166. 446 p,b 166 101 r488 100w 200n m3965 97 152 5 Excavating half the square with big pick. .ri vVE 447 p,b 140 13 m4030 100w 200n m3965 104 152 Excavating half of the square with a big pick. .rd P814 .ri mH 448 p,b 167 102 m4065 200s 200w m3814 145 155 10 Finishing the excavation of the top soil with a big pick. .ri sc 449 p,b 166 101 r488 200n 200w m3965 98 155 7 Removing half of the square with a big pick. 450 p 140 13 r488 200n 200e m3965 108 155 15 Northern half of the unit. 451 p 160 5 m3967 200e 100s m3967 142 155 40 Removing N baulk of a big pick. 452 p 168 15 m4067 400w 400s m4067 139 155 10 Starting to excavate with a big pick. .ri aL 453 p 169 102 m4064 300w 600s m4064 132 153 10 Removing f169. .ri sC 454 p 166 101 r488 200n 200w m3968 98 155 7 Pottery recovered from the sifter. .ri mH 455 p,b 171 13 r488 200n 200e m3965 89 155 5 Charcoal and gypsum close to wall feature f128. 456 p,b 172 101 30e 30s Column of a tent pole. 457 p 173 100 r492 980s 220e m4054 125 154 10 Removing f173, contaminated. .ri sC 458 p,b,i 174 101 r488 200w 200n m3965 91 155 14 Pottery from below 459 p 174 101 r488 200w 200n m3965 91 155 14 Pottery recovered from the sifter. 460 p 176 13 r493 80n 100w m3965 123 147 20 Excavation of the pedestal of stone f175. 461 p 171 13 r500 20n 20w m3965 89 155 5 In the NE corner of k13 there was a concentration of pottery; therefore we kept it separate from the rest of the area. 462 p,b 171 13 r493 200n 200e m3965 84 155 Presence of gypsum and charcoal close to f128; pottery lot flagged for mKB. 463 p,b 174 101 r488 200n 200w m3965 77 147 9 Excavation with a big pick. 464 p,i 174 101 r488 200n 200w m3965 77 147 9 Pottery recovered from the sifter. 465 p 160 5 m3969 200w 100s m3967 141 155 40 Removing N baulk of a big pick. .ri aL 466 p 173 100 m4054 300s 220w m4054 110 147 10 Continuing removing f173 in the German trench, contaminated. .ri sC 467 p 177 5 m4051 100n 400e m3967 92 142 10 Excavated with a big pick. .rd P815 .ri vVE 478 p,b 168 15 m4067 400w 400s m3885 110 148 29 Excavated with a big pick. The area is still contaminated (plastic bags and modern metal). 479 p,b 177 5 m3967 400e 100s m3967 73 148 N baulk, excavated with a big pick. 480 p,i 171 13 r488 200n 200e m3965 78 148 6 .ri aL 481 p 173 100 m4055 600s 220w m4054 108 146 10 Continuing excavating f173. .ri vVE 482 p,b 174 101 r488 200n 200w m3965 68 148 6 Excavated with a big pick. 483 p,b 174 101 r488 200n 200w m3965 68 148 6 Siftd. .ri aL 484 p,b 173 100 m4054 900s 220w m4054 104 148 6 Removing f173 just to the bottom of the German trench. .ri vVE 485 p,b 174 101 r488 200n 200w m3965 62 148 9 Excavating with a big pick. 486 p,b 174 101 r488 200n 200w m3965 62 148 9 Sifted. .ri sC 487 p,b 171 13 r488 200n 200e m3965 72 148 10 Excavated with a small pick. .ri vVE 488 p,b 178 5 m3969 140s 100E m3969 0 11 Big pick, Removal of deposit againts E side of E baulk of k5. .ri sC 489 p 174 101 r488 200n 200w m3965 54 148 5 Excavating with a big pick, concentration of ashes abutting f128. 490 p 174 101 r488 200n 200w m3965 54 148 5 Sift of q489. 491 p,b 171 13 r488 200n 200e m3965 62 148 10 Excavated with a big pick. .ri aL 492 p,b 179 100 m4054 900s 220w m4054 97 147 10 Beginning to remove f179. .ri vVE 493 p,b 180 5 m3969 140s 100w m3969 0 11 Removal of part of E baulk of k5. .ri sC 494 I,p,b 182 101 r488 200n 200w m3965 39 138 10 .rd P816 495 p 182 101 r488 200n 200w m3965 39 138 0 Sift lot of q494 496 p,b 183 13 r488 200n 200e m3965 42 138 8 Excavating the area with a big pick. 497 p,b 181 4 m4084 200n 600e m4084 100 138 Excavating the area with a big pick. 498 p,b 179 100 m4054 300s 220w m4054 81 138 20 Small pick, contaminated. .ri mH 499 p 184 23 m3698 260e 400w m3698 0 11 39 Topsoil of k23, leaving the western 1.4 m unexcavated. .ri sC 500 p 168 15 m3885 200s 400e m3887 79 139 10 Excavating the area with a big pick. NE area still contaminated by modern material. 501 p 181 4 m4085 200n 200e m4084 100 138 Finishing excavation of the area of q497. 502 p,b 162 14 m4031 250s 300w m4034 124 138 8 Excavating 10cm with a big pick. The area is contaminated. .ri vVE 503 p,b 187 23 m3698 260w 400s m3698 93 143 2 With a big pick. Area is not completely level yet. .ri sC 504 p 162 14 4034 100e 250s m3965 112 147 10 Continuing excavating the area, stil contaminated. .ri vVE 505 p 168 15 3887 200n 400w m3887 79 139 7 Excavating the southern half with a big pick. .ri sC 506 p,b 162 14 m4034 250s 300e m3965 100 147 8 Excavating the area with a big pick. 507 p 181 4 r445 600e 200s m4084 100 138 Excavating the area with a big pick. 508 p,b,i 187 23 m3998 260w 400s m3698 91 143 Excavating 10 cm down with a big pick after having made the surface level. 509 p,b 186 15 r503 60e 40n m4067 115 144 50 Removing pedestal of stone f185.1 .ri aL 510 p,b 179 100 m4055 300s 220w m4054 61 143 2 Finishing excavating bottom of f179. .rd P817 .ri sC 511 p,b 162 14 m4034 250s 300e m3965 89 144 3 Cleaning f162 and better definition of areas close to N baulk. A piece of tannur (q511.2) was recovered. 512 p,b 188 4 r509 200e 200n m4084 86 144 8 Mamo is excavating with a small pick in order to expose possible bricks. 513 p,b 189 4 r509 200w 200n m4084 78 144 8 Excavating with a big pick. 514 p,b,i 193 15 m4067 400s 400w m4067 76 144 23 Excavating all of k15 with a big pick. The area is not contaminated any more by a German trench. 515 p,b 190 14 m3967 400n 100w m3967 124 144 100 Excavating the E baulk with a big pick. 516 p 190 14 m3967 400n 100w m3967 123 144 0 Excavating the E baulk with a big pick. .ri aL 517 p 192 100 m4055 m4054 79 144 20 Pedestal of f170.7 .ri sC 518 p 193 15 m4067 400s 400w m4067 53 144 Excavation of half of the area with a big pick. Same as f162. .ri aL 519 p 194 100 m4054 300s 220w m4054 86 142 10 Excavation of red surface f194. .ri sC 520 p 162 14 m4034 200e 150s m3965 86 144 Excavation of the western area with a big pick. .rd P818 .ri vVE 521 p,b 189 4 m4084 200e 200n m4084 70 145 15 Excavating with a big pick. 522 p,b 187 23 m3698 400s 400w m3698 57 145 10 Excavating the whole area with a big pick. .ri sC 523 p,i 195 15 m3885 100n 400e m3885 150 145 Excavating baulk with a big pick. The NE area of the baulk is contaminated by the presence of a German trench.