Unit Book J3

The Terrace Edge, Center (Version 1a)

August 2023

SEC J03 Topic T Qlot Analysis AU cJc; rL D June 2016 TO qlot; analysis; shape codes

This list contains an accounting of all the qlots and notes if shape sherds have been recorded and if body sherds have been recorded. The final column, “notes,” indicates any additional relevant information about why the sherds were likely not included. For example, topsoil units were regularly analyzed by looking through the sherds and counting them without a full analysis due to their limited use for typologies. As a result, we do not expect there to be full records for these qlots.

The J3 ceramic analysis is incomplete at this point. Although a signficant effort was made to analyze the majority of the sherds, the documentation had not been fully processed at the end of the 2010 season. As a result, although some qlots have been analyzed the full analysis is not currently available in the published book. In particular the qlots between q317 and q480. Selected qlots are also missing between q290 and q315. Where possible the data has been added based on existing drawings. In the future it may be possible to recover scans of some of the analyzed material for now it remains inaccessible.

QlotShapeBodyNotes
q1 xxalso field analysis
q2 xx
q3 xx
q4 xx
q5 xx
q6 xx
q7 x
q8 
q9 
q10 xx
q11 xx
q12 xx
q13 x
q14 xone drawing of shape sherd
q15 x
q16 xx
q17 xx
q18 xx
q19 xx
q20 xx
q21 xx
q22 xsome shape sherds added based on drawings
q23 xx
q24 xx
q25 x
q26 xx
q27 x
q28 x
q29 xx
q30 x
q31 x
q32 xone drawing of shape sherd
q33 x2 shape sherd drawings
q34 x
q35 xx
q36 x
q37 xx
q38 xx
q39 xx
q40 x
q41 x
q42 xx
q43 xx
q44 xx
q45 xx
q46 xx
q47 xx
q48 xx
q49 x
q50 xx
q51 xx
q52 x
q53 xx
q54 text description from mKB
q55 x
q56 x
q57 xx
q58 xx
q59 xx
q60 
q61 x
q62 xx
q63 xx
q64 xx
q65 xx
q66 xx
q67 xx
q68 xx
q69 xx
q70 x
q71 xx
q72 xx
q73 xx
q74 xx
q75 mKB notes and 3 sherds added from drawings
q76 x
q77 xx
q78 xsherds added from drawings and notes from mKB
q79 x
q80 xx
q81 sherds added from drawings
q82 x
q83 sherds added from drawings
q84 xx
q85 xx
q86 mKB notes
q87 mKB notes and 2 sherds added from drawings
q88 xx
q89 xx
q90 x
q91 xx
q92 xx
q93 
q94 x
q95 xx
q96 xx
q97 xmKB note on one sherd
q98 
q99 x
q100 no ceramics in this lot according to UGR
q101 x
q102 
q103 some sherds added based on drawings
q104 x
q105 xx
q106 x
q107 
q108 no ceramics in this lot according to UGR
q109 x
q110 x
q111 xsingle sherd given
q112 
q113 no ceramics in this lot according to UGR, but one sherd given.
q114 x
q115 some sherds added based on drawings
q116 x
q117 
q118 x
q119 x
q120 x
q121 
q122 xx
q123 x
q124 x
q125 notes from mKB
q126 x
q127 x
q128 x
q129 x
q130 x
q131 x
q132 xone painted body sherd
q133 x
q134 x
q135 x
q136 x
q137 
q138 x
q139 mKB note
q140 x
q141 Note from mKB and drawings of 2 sherds
q142 Note from mKB and drawings of 2 sherds
q143 
q144 
q145 note from mKB along with given sherd total
q146 note from mKB along with given sherd total
q147 note from mKB along with given sherd total
q148 note from mKB along with given sherd total
q149 x
q150 
q151 note from mKB along with given sherd total
q152 
q153 note from mKB along with given sherd total
q154 note from mKB along with given sherd total
q155 note from mKB along with given sherd total
q156 x
q157 x
q158 x
q159 xmKB notes
q160 x
q161 x
q162 
q163 xmKB notes
q164 xmKB notes
q165 
q166 mKB notes
q167 Note from mKB and drawings of 2 sherds
q168 Note from mKB and drawings of 2 sherds
q169 mKB notes
q170 
q171 
q172 mKB note
q173 xmKB note
q174 x
q175 
q176 
q177 
q178 note from mKB along with given sherd total
q179 x
q180 xnote from mKB along with given sherd total
q181 topsoil
q182 note from mKB along with given sherd total
q183 
q184 note from mKB along with given sherd total
q185 mKB note
q186 
q187 note from mKB along with given sherd total
q188 
q189 
q190 
q191 
q192 note from mKB along with given sherd total
q193 note from mKB along with given sherd total
q194 note from mKB along with given sherd total
q195 
q196 
q197 mKB notes
q198 
q199 
q200 
q201 
q202 topsoil
q203 
q204 
q205 
q206 
q207 note from mKB along with given sherd total
q208 
q209 
q210 x
q211 note from mKB along with given sherd total
q212 x
q213 note from mKB along with given sherd total
q214 
q215 note from mKB along with given sherd total
q216 
q217 
q218 
q219 no ceramics according to UGR
q220 
q221 note from mKB along with given sherd total
q222 note from mKB along with given sherd total
q223 
q224 
q225 note from mKB along with given sherd total
q226 note from mKB along with given sherd total
q227 
q228 xonly one sherd
q229 
q230 
q231 note from mKB along with given sherd total
q232 
q233 
q234 
q235 
q236 topsoil
q237 note from mKB along with given sherd total
q238 
q239 
q240 
q241 
q242 xmKB notes
q243 note from mKB along with given sherd total
q244 
q245 x
q246 x
q247 
q248 
q249 x
q250 x
q251 x
q252 note from mKB along with given sherd total
q253 xone sherd
q254 
q255 
q256 note from mKB along with given sherd total
q257 
q258 
q259 note from mKB along with given sherd total
q260 x
q261 x
q262 x
q263 x
q264 x
q265 
q266 
q267 
q268 
q269 
q270 xnote from mKB along with given sherd total
q271 
q272 note from mKB along with given sherd total
q273 
q274 note from mKB along with given sherd total
q275 
q276 
q277 
q278 note from mKB along with given sherd total
q279 
q280 xx
q281 x
q282 
q283 
q284 note from mKB along with given sherd total
q285 x
q286 note from mKB along with given sherd total
q287 note from mKB along with given sherd total
q288 note from mKB along with given sherd total
q289 note from mKB along with given sherd total
q290 xx
q291 
q292 
q293 x
q294 
q295 note from mKB along with given sherd total
q296 note from mKB along with given sherd total
q297 note from mKB along with given sherd total
q298 note from mKB along with given sherd total
q299 
q300 note from mKB along with given sherd total
q301 note from mKB along with given sherd total
q302 x
q303 note from mKB along with given sherd total
q304 note from mKB along with given sherd total
q305 
q306 note from mKB along with given sherd total
q307 note from mKB along with given sherd total
q308 
q309 
q310 
q311 
q312 
q313 
q314 
q315 x
q316 x
q317 
q318 
q319 xmKB notes
q320 
q321 
q322 
q323 xmKB notes
q324 
q325 
q326 
q327 
q328 notes from mKB and some sherds added from drawings
q329 
q330 
q331 
q332 
q333 
q334 
q335 
q336 
q337 one sherd added from drawing
q338 mKB notes and some sherds added from drawings
q339 mKB notes and some sherds added from drawings
q340 
q341 
q342 mKB notes
q343 
q344 
q345 
q346 
q347 mKB notes and some sherds added from drawings
q348 
q349 
q350 
q351 
q352 
q353 
q354 one sherd added from drawing
q355 
q356 
q357 
q358 
q359 mKB notes
q360 
q361 
q362 
q363 
q364 
q365 
q366 
q367 some sherds added based on drawings
q368 
q369 
q370 
q371 
q372 
q373 
q374 mKB notes
q375 
q376 
q377 
q378 
q379 
q380 
q381 
q382 
q383 
q384 
q385 
q386 
q387 
q388 
q389 
q390 
q391 
q392 
q393 
q394 
q395 
q396 
q397 
q398 
q399 
q400 
q401 
q402 
q403 
q404 
q405 
q406 
q407 
q408 
q409 some sherds added based on drawings
q410 xmKB notes
q411 mKB notes and some sherds added based on drawings
q412 mKB notes and some sherds added based on drawings
q413 
q414 
q415 
q416 
q417 
q418 mKB notes and one sherd added from drawing
q419 mKB notes and one sherd added from drawing
q420 mKB notes and two sherds added from drawing
q421 mKB notes and some sherds added based on drawings
q422 mKB notes and some sherds added based on drawings
q423 mKB notes
q424 mKB notes
q425 no ceramics, see i33
q426 mKB notes
q427 mKB notes
q428 mKB notes
q429 mKB notes
q430 mKB notes
q431 mKB notes
q432 
q433 
q434 
q435 mKB notes
q436 mKB notes
q437 mKB notes
q500 
q501 x
q502 
q503 x
q504 
q505 
q506 
q507 x
q508 
q509 xpartial entry - only 2 out of sequence sherds
q510 x
q511 topsoil
q512 
q513 x
q514 x
q515 
q516 mKB notes and 1 sherd added based on drawing
q517 mKB notes
q518 mKB notes and sherd total given
q519 mKB notes and sherd total given
q520 x
q521 mKB notes and sherd total given
q522 mKB notes and sherd total given
q523 mKB notes and sherd total given
q524 x
q525 x
q526 x
q527 x
q528 
q529 x
q530 x
q531 
q532 
q533 x
q534 x
q535 x
q536 x
q537 x
q538 x
q539 x
q540 x
q541 
q542 
q543 
q544 topsoil
q545 
q546 
q547 x
q548 mKB notes and sherd total given
q549 mKB notes and sherd total given
q550 mKB notes and sherd total given
q551 
q552 
q553 
q554 
q555 
q556 
q557 
q558 
q559 
q560 topsoil. Sherds added based on drawings
q561 
q562 Some sherds added based on drawings
q563 mKB notes
q564 
q565 xx
q566 
q567 
q568 
q569 no ceramics according to UGR
q570 one sherd added based on drawing
q571 
q572 
q573 
q574 
q575 
q576 
q577 
q578 
q579 
q580 
q581 
q582 x
q583 x
q584 
q585 
q586 
q587 
q589 
q590 mKB notes and sherd total given
q591 
q592 
q593 x
q594 x
q595 
q596 
q597 
q598 
q599 

Back to top