The checklist
|
| Task
Purpose
| 1
| Overview, General inspection
| General Check
|
| 2
| Check temple area for erosion, debris, vegetation
| Site Maintenance and Visitors — Visitor safety and preservation
|
| 3
| Inspect plaster on temple structure
| Site Preservation — Identify surface deterioration
|
| 4
| Check for weed removal
| Site maintenance and risks prevention — growth damage, fire prevention
|
| 5
| Inspect paths: cleanliness and visibility
| Site Maintenance and Visitors — Visitor safety & appearance
| | |
Back to top: Temple BA
Notes
Back to top: Temple BA
1. August 6, 2025
Observations:
- There were a few weeds in the area of the Lion Temple, and
significantly more in the area of the German excavation??, in front of
the Great Staircase
- The removed weeds were gathered in front J3
- A few pages of the signs are missing in the temple area
- There is no erosion on the walls of the temple
- Some debris has been observed accumulating in one corner of the Lion
Temple
- The corner of the Panorama is broken
- The sign structures are in good condition
- No burning activity observed
Suggestions:
- The inspection of the Panorama is mentioned twice in the file, while the
signs in the temple area are not mentioned at all. Please correct it.
- The pathways in the temple area require more attention and should be
cleaned
- Remove the phrase “erosion” and place it together with “inspecting
plaster on temple structure” in the file
- Remove the phrase ” vegetation” and “debris” and place it together
with ” Checking for weed removal” in the file.
- Reordering the pages of the signs based on the observations from the
website
Photographs:
1. Overview
2. Checking
for erosion
3. Inspecting
plaster
4. Checking
for weed removal
5. Inspecting
paths

|

|

|

|

| | | | | |
Back to top: Temple BA
2. August 15, 2025
Observations:
- There were a few weeds in the area of the Lion Temple, and in front of the
staircase.
- The removed weeds were gathered in front J3
- A few pages of the signs are missing in the temple area
- There is no erosion on the walls of the temple
- Some debris has been observed accumulating in one corner of the Lion
Temple
- The corner of the Panorama is broken
- The sign structures are in good condition
- No burning activity observed
Suggestions:
- Plastering of the Lion Temple’s wall, could be carried out before the winter
- Cleaning the paths and the tracks
- More attention to the panels, and reordering them based on the observations
from the website
- Repairing the damaged panorama and the iron fence surrounding the
excavations
Photographs:
1. Overview
2. Checking
for erosion
3. Inspecting
plaster
4. Checking
for weed removal
5. Inspecting
paths

|

|

|

|

| | | | | |
Back to top: Temple BA
3. August 31, 2025
Observations:
- No weeds.
- No erosion on the walls of the temple
- The sign structures are in good condition
- No burning activity observed
- Pathways are clean except for one
Photographs:
1. Overview
2. Checking
for erosion
3. Inspecting
plaster
4. Checking
for weed removal
5. Inspecting
paths

|

|

|

|

| | | | | |
Back to top: Temple BA
4. September 15, 2025
Observations:
- No weeds.
- No erosion on the walls of the temple
- The sign structures are in good condition
- No burning activity observed
- Pathways are clean
Photographs:
1. Overview
2. Checking
for erosion
3. Inspecting
plaster
4. Checking
for weed removal
5. Inspecting
paths

|

|

|

|

| | | | | |
Back to top: Temple BA
5. September 30, 2025
Observations:
- The overall condition is good
Photographs:
1. Overview
2. Checking
for erosion
3. Inspecting
plaster
4. Checking
for weed removal
5. Inspecting
paths

|

|

|

|

| | | | | |
Back to top: Temple BA
6. October 15, 2025
Observations:
- The overall condition is good, except for Wall C2-3, which is very crumbly. I am going to assess all the palace walls soon.
- The tannur cover and sewage cover have been repaired, I will send you a detailed report on the metal works soon.
- The protective systems are currently being plastered.
Suggestions:
- Is it possible to unify the color of the panorama on site to either white or blue?
Photographs:
1. Overview
2. Checking
for erosion
3. Inspecting
plaster
4. Checking
for weed removal
5. Inspecting
paths

|

|

|

|

| | | | | |
Back to top: Temple BA
7. October 31, 2025
Observations:
- There are no observations to report in the temple area, no weeds or burning activity.
- I would like to note that mortar will be applied between the stones on the staircase and in other areas soon.
- The panorama also requires repainting, as mentioned in the previous report, and some of the cement blocks forming the pathways need to be renewed as well.
- All of this work will be carried out after the completion of plastering on the protective systems in the palace area
Photographs:
1. Overview
2. Checking
for erosion
3. Inspecting
plaster
4. Checking
for weed removal
5. Inspecting
paths
|
|

|

|

|

|

| | | | | |