Back to top: Palace
Introduction
The palace is considered one of the areas that require the most frequent inspections due to the presence of brick walls, some of which are very fragile and therefore need regular monitoring to assess their current condition and carry out the necessary interventions to protect them, as is the case with wall C2-3.
Details regarding the other walls are not included on this page, but in synopsis the process focuses on ensuring that no water leaks from the protective systems above down to the lower, which could cause damage.
The inspection also includes checking the condition of the burlap and whether the plastic sheeting (nylon) is placed properly. Despite the presence of a protection system, the walls are additionally covered with plastic to ensure protection in case rainwater infiltrates.
The monitoring work also includes:
- Ensuring the cleanliness of the palace and the removal of dirt and weeds.
- Checking the condition and cleanliness of the pathways to ensure safe access for visitors.
- Inspecting the covers placed over the exposed archaeological installations, such as the tannur, the bath, and the remaining installations.
Additionally, the condition of the informational panels is inspected.
Back to top: Palace
The checklist
| 1
| Inspecting Panorama
| Site Maintenance and Visitors
| 2
| Inspecting Panels
| Site Maintenance and Visitors
| |
Back to top: Palace
Notes
Back to top: Palace
1. August 6, 2025
Observations:
- Panorama in good condition
- Panorama casing is in good condition
- The signs are in good condition
Photographs:
Panorama Panels
| ![]()
| ![]() |
Back to top: Palace
2. August 15, 2025
Observations:
- Panorama in good condition
- Panorama casing is in good condition
- The signs are in good condition, except for the sign in the room D1, which is currently under repair
Photographs:
Panorama Panels
| ![]()
| ![]() |
Back to top: Palace
3. August 31, 2025
Observations:
- The signs are in good condition
Photographs:
Panorama Panels
| ![]()
| ![]() |
Back to top: Palace
4. September 15, 2025
Observations:
- No observations.
Photographs:
Panorama Panels
| ![]()
| ![]() |
Back to top: Palace
5. September 30, 2025
Observations:
- The overall condition is good.
Photographs:
Panorama Panels
| ![]()
| ![]() |
Back to top: Palace
6. October 15, 2025
Observations:
- The overall condition is good.
- Is it possible to unify the color of the panorama on site to either white orblue?
Photographs:
Panorama Panels
| ![]()
| ![]() |
Back to top: Palace
7. October 31, 2025
Observations:
- No observations.
Photographs:
Panorama Panels
| ![]()
| ![]() |
Back to top: Palace
8. November 15, 2025
Observations:
- No observations.
Photographs:
Panorama Panels
| ![]()
| ![]() |
Back to top: Palace
9. November 30, 2025
Observations:
- No observations.
Photographs:
Panorama Panels
| ![]()
| ![]() |
Back to top: Palace
Synopsis
Panorama Panels Aug. 6 2025
| ![]()
| ![]() Aug. 15 2025
| ![]()
| ![]() Aug. 31 2025
| ![]()
| ![]() Sep. 15 2025
| ![]()
| ![]() Sep. 30 2025
| ![]()
| ![]() Oct. 15 2025
| ![]()
| ![]() Oct. 31 2025
| ![]()
| ![]() Nov. 15 2025
| ![]()
| ![]() Nov. 30 2025
| ![]()
| ![]() |
Back to top: Palace