- installations that are set in place intentionally, and appear as either horizontal surfaces or as ordered aggregation, and
- deposits that can result either from either layering or buildup, or else from an amorphous amassment.
Click on column headers to change sort order.
Definition | Total | Percentage | Histogram |
---|---|---|---|
accumulation | 3 | 11% | |
accumulation A | 1 | 4% | |
accumulation B | 1 | 4% | |
accumulation C | 4 | 14% | |
brick structure | 1 | 4% | |
cu | 2 | 7% | |
fill | 2 | 7% | |
floor, type b | 1 | 4% | |
floor, type c | 1 | 4% | |
floor, type d | 2 | 7% | |
floorsurface in general | 1 | 4% | |
isolated individual brick | 1 | 4% | |
pit | 1 | 4% | |
topsoil | 3 | 11% | |
wall | 4 | 14% | |
Total | 28 | 100% |