.bk A09 .fl H620jo-2.j .fd h/j .ei jo .ed H620 .rd H617 .ri jo -dy We began digging k2 top soil , starting just W of the eastern bulk , we will collect sherds in a zambil to be checked by MKB . -so The waterbed of the waddy croses A9 at the middle of the area . flowing E to W at the northern bulk of k2 , turning to the S at the eastern bulk of k1 . k 2 ac I was informed by workman , mohamad omu , that years ago a hole was dug in aproxematly NE corner of k2 , by unknown person(s) in a robbery attempt , he then filled it back as soon as he discovered the incident . .rd H618 -sg We will continue working in k2 , and will start excavating k3 . If we will have sufficient number of workmen we will also start in k1 . k 2 dy Because of the sharp slope caused by the wadi , the eastern part of k2 is much higher than the western part , that is why we still diging in the eastern part of k2 and not yet reashed the level of the western porshon of k2's top soil . k 3 sg Because of the wadi slop we will dig k3 starting from the highest point which is the NW corner of k1 . .ri jm k 1 nv Relay 1 was taken aproximately 1 meter N of actual SW corner of k1 , because actual corner is located above 20cm S of unexcavated A9 . f 3 ds soft brownesh accumulation below topsoil . It contains small stons and sherds . f3 seems to be gully wash ( wadi accumulation ) . -dy We started cuting the section N A6k217 and we had to stop because of the dust we created for A6 group . Will finish this work when they move their operation to farther away portion of their area . -dy Measured coordinates and elevations of our squares . .ri jo f 4 ds topsoil f4 is a mixture of topsoil and a dirt leaked from the sandbags used as a dam .