.bk A09 .fl H620jo.j .fd h/j .ei jo .ed H620 .rd H615 .ri jo a 1 df dw ds Doorway in the E-W wall A6f78, an access between A9 (sector G) and A6 (sector D) . Same as A6f217. f 1 df w ds N-S wall, same as A6f39 nc Bonds with wall A6f78, which shoud have been assigned an A9 feature number .rd H616 -dy Workmen started to remove the sandbag wall that was placed in the southern portion of A9 at the end of last excavation season to protect A6 excavation from any damage that would be caused by water brought down the wadi during the rain season . Workmen were instructed by A6 staff. -dy The surveyor will start today to lay out the squares in A9 (k1, k2 and k3). .rd H617 -dy While the surveyor is measuring and laying out the squares, we had the workmen cleaning up and removing the sandbags northern k3. -dy When the orientation of squares had ben changed from AS to Ak orientation , A9's SW corner (SW k1) had to be shifted a little to inside A6 area. -sg We decided to place the northern square k3 in the middle in between k1 and k2, 3m N of k2, 2m N of k1 (See sketch 2). By doing that we expect the projected extension of the wall (f1) would be expanded to the north at the middle of k3.