.bk A14 .fl O711jw.j .fd daily journal O710 .ed O711 .rd O710 .ri jw -sf jw and gm worked full days and evenings at home O709 and O710 to enter and process all recorded data to give to gb for the browser edition of the A14 global record for the first half of the MZ17 excavation season. -dy received all LORES and Thumbnail photos from jjj and put them into record. Entered all pending logs and processed them through the "J" and "E" programs. jw developed tentative stratigraphic assignments for the loci we have excavated so far, k3 to k5, k13 to k15, and k23 to 25 in preparation for a meeting with gb and mkb O710. -sr A14 staff met with mkb and gb to discuss tentative strata assignments. jw proposed 14 strata based on stratigraphic observvations and pottery analysis by mkb. Two combined and one moved down two places as a result of thise discussions. gb and mkb need to visit site to gain familiarity with the relationship between features and their connection with the pottery lots analyzed.