.bk A15 .fl L725vp1.j .fd daily journal .ei vp .ed L725 .rd L725 .ri vp k 5 sg we will open the first locus, k5, on the south area of A15 to look for some links between both sides. Tariq Ali and Suliman will dig there. We will remove the ground on the SW slope of k5:the other workers will dig there. dy the biggest part of workers spent all the day to remove the ground on the south of the new locus, k5. vp and Adib took the corners relais of the area to be excavated of k5. Then Tariq, Ali and Suliman, with big picks, started to remove the top soil, not very hard, c#10YR7/3 co pale brown, f300. Under of it, it was possible to see the granular accumulation f301, producted by the rain and the wind, c#10YR5/3 co brown. They removed it with big picks and cleaned all the locus. During the cleaning it was possible to see some pebbles and sherds f302, on the SW corner and about on the middle of the locus, and a hard a f303 on the south half of k5. In the N half the f301 continued for about 15cm down. Tariq with the trowel tried to explorer the f303 and found, about in the middle of the E section a big door socket and 1m to W an other one smaller. Then, they removed the f302, f303 and cleaned the entire locus.