https://urkesh.org/MZ/A/A20/D/W/0010.htm

Unit Book A20

A20w10

Processed on 2024-10-14

2. IDENTIFICATION

Designation

Roster Date Author Record
Description (summary) 2008-09-11 lC Plan showing some different installations between k3 and k13. In k3 we can see the sherd and pebble pavement f35 before its removal, and the ash layer f36 next to the vertical mud bricks belonging to f68, some kind of installation and labeled as brick pile. Just to the north of the bricks there is the tannur f42, and the big cobblestone pavement f43 and f50 extending between the north part of k3 and the southern of k13. Both the pavement f35 and f43 - f50 were drawn in prevision of their removal. [Input: S911LC.J]

6. REFERENCE

Analogical Record

Roster Date Author Record
Drawing of context (w 2-D)

2008-08-11 eE [Input: A20_VWX.j]
View/drawing of features 2008-09-11 lC f31 (layer), f35 (pavement, type c), f36 (accumulation C), f42 (tannur (feature)), f43 (pavement, type c), f50 (pavement, type c), f68 (brick pile) [Input: S911LC.J]
View/drawing of locus 2008-09-11 lC k3, k13 [Input: S911LC.J]
View/drawing orientation 2008-09-11 lC looking overhead [Input: S911LC.J]