.bk J04 .fl Q823sC.j .fd daily journal#Q823 .ei sC .rd Q823 .ed Q823 .ri sC -sf Before breakfast pC stayed at home with mKB. cC toghether with mNH drawned the N section of k71, while aS and I drawned the E section of k62. After breakfast cC stayed at home with mKB (since cC will be responsible of the object storage). At 8am I come back home to check my journal files, and stood there until 12am: the idea was also to help mNH and vN in drawing J04 sections with freehand, but there was no electricjty. Therefore mNH come back to the filed and nV described some of the J02 objects held over from last year excavation season. k 73 dy Today we finished to remove the N baulk of k73 (f21, q84). I then moved the team working here [?] and half to k64. k 64 dy Yesterday we finished to work in this locus. Today we started and finish remove the N baulk (f41, q86, q91). We stop digging here at theelevation of m3817 +35-15 [?]. dy Today we started to remove the N baulk, f39 (q88, q90)- The goal was to start and finish [?] remove the N baulk of the locus. The work has been very slow and the workmen removed only in part [?](half). k 61 dy Today we continued digging f43 in all the unit (q85). f43 is medium compa[ct] [?] and crumble. After two pick runs we decided to change feature number: we assigned f44 [to the] accumulation below, which seems to be the same natural accomulation as f43 (q87, q89, q92, q93) [?] on hardness. f44 it is medium compact with few patckes of soft soil and it is greyish in color. [Tom]ororrow we should reach the bottom of the German trench (N and E to k61): we will then stop digging{?]. Then, we will start to remove a small portion of the S baulk of k61, in order to reach the same [?] in the whole locus.