.bk J04 .fl Q824sC.j .fd daily journal Q824 .ei sC .ed Q824 .rd Q824 .ri sC -sf Before breakfast cC and vN and stayed at home with pC entering data on computer. In the field, mNH and aS drawned the E section of k64. After breakfast cC, pC, vN and mNH stayed at home making J4 templates. k 63 dy Today we finished to remove the N baulk (f39, q95). We stop digging this feature at the elevation of m4307 +7 -145. k 61 dy Today we continued digging f45 in all the unit (q94, q96, q97, q98). I move some workmen in this unit. At the end of the day we reach the the bottom of the German trench (N and E to k61) and we thus finished digging in k61, at the elevation of m3817 +45 -150. k 63 dy Today we started and finished to remove the N baulk of k63 (f46, q99, q100). We stop digging in this unit at the elevation of m4300 +35 -150. ;MANCA LOCUSSSSSSSSSSSSSSSSSSS k xx dy Yesterday in the afternoon the elevator was set up, and today we start collecting all the pottery sherds recovered with the swifting of the dirt belonging to the whole excavation area. We collected 5 q-logs (q999, q998, q997, q996 and q995) and one item (q995.1).