Roster |
Date |
Author |
Record |
Daily notes about recovery of elements |
2006-08-30 |
mS |
began excavating the north baulk adjacent to k31. We are cutting this back as part of the strategy to open a view to the wall and its curvature. Uncovered f218 which is a small installation of stones and sherds, part of the random habitation. [Input: Q824MS.j] |
2006-08-31 |
mS |
Photographed and removed f218, a small installation of stones and sherds. Slow going in this area and not much dirt was removed. May cease here for the moment and move directly north to k31 along the terrace wall. [Input: Q824MS.j] |
2006-09-03 |
mS |
returned to removing the baulk. It is slow going because of the dirt removal but hope to have the Shafat in place tomorrow to help with this. [Input: Q902MS.j] |
2006-09-04 |
mS |
finished removing the north baulk down to the level just below the top of the wall f72. It is even with the level in k31 to the north. [Input: Q902MS.j] |
2006-09-05 |
mS |
finished bringing this baulk area down to the level of k31 running just below the top of the wall, f72. [Input: Q902MS.j] |