.bk J03 .fl P809jW.j .fd daily journal P808 -wk,-eq,-sf,-dy .ei jW .ed P808 .rd P808 .ri jW -wk 3 picks and 6 in support. Two picks working in k101 and one in k12. -eq Elevator operational. Allowed substantial increase in efficiency, increasing speed of excavation by 50% from accumulations more than 2 meters below the surface. Used 2 picks and 4 removal, with backdirt loaded directly onto trailers by the elevator. -sf gM worked at home all day processing data and preparing templates. -dy Removed one large floating stone from the SW corner of k101. Spent the last hour cleaning in preparation for a major photograph at the start of work tomorrow.