.bk J03 .fl P908jW.j .fd daily journal P908 -wk,-sf,-sn,-sg .fn corrections and additions made by jW on Q415 .ei jW .ed P908 .rd P908 .ri jW -wk three picks and six removal personnel reported for work. At various times all were detailed to general site cleanup and preparations for the visit of the Minister of Culture later this evening. Abd el Hamid assigned to J3 from J2 to assist in drawing sections. -sf rE worked at home preparing documents for the visit later today of the Minister of Culture. jW on site for the entire work day. -sn Student Zuzan and Abd el Hamid drew the north and east sections of k103. String elevation, 9070, was taken from m4217. -sg No work will be done in the field on Friday, P909 and Saturday, P910. jW will work in the house on P910. rE will depart for a short trip to Damascus on P909 to return on Sunday, P911. We anticipate drawing the sections in k104 and k105 on Sunday, P811. Final photographs will be taken soon thereafter.