Conservation (Version 1)

Inspections checklist

Temple BA

Amer Ahmad – November 2025

Back to top: Temple BA

Introduction

explain in general about the conservation work in Temple area

Back to top: Temple BA

The checklist

Task
Purpose
1 Overview, General inspection General Check
2 Check temple area for erosion, debris, vegetation Site Maintenance and Visitors — Visitor safety and preservation
3 Inspect plaster on temple structure Site Preservation — Identify surface deterioration
4 Check for weed removal Site maintenance and risks prevention — growth damage, fire prevention
5 Inspect paths: cleanliness and visibility Site Maintenance and Visitors — Visitor safety & appearance

Back to top: Temple BA

Notes

Back to top: Temple BA

1. August 6, 2025

Observations:

  • There were a few weeds in the area of the Lion Temple, and significantly more in the area of the German excavation??, in front of the Great Staircase
  • The removed weeds were gathered in front J3
  • A few pages of the signs are missing in the temple area
  • There is no erosion on the walls of the temple
  • Some debris has been observed accumulating in one corner of the Lion Temple
  • The corner of the Panorama is broken
  • The sign structures are in good condition
  • No burning activity observed

Suggestions:

  • The inspection of the Panorama is mentioned twice in the file, while the signs in the temple area are not mentioned at all. Please correct it.
  • The pathways in the temple area require more attention and should be cleaned
  • Remove the phrase “erosion” and place it together with “inspecting plaster on temple structure” in the file
  • Remove the phrase ” vegetation” and “debris” and place it together with ” Checking for weed removal” in the file.
  • Reordering the pages of the signs based on the observations from the website

Photographs:

1. Overview
2. Checking
for erosion
3. Inspecting
plaster
4. Checking
for weed removal
5. Inspecting
paths





Back to top: Temple BA

2. August 15, 2025

Observations:

  • There were a few weeds in the area of the Lion Temple, and in front of the staircase.
  • The removed weeds were gathered in front J3
  • A few pages of the signs are missing in the temple area
  • There is no erosion on the walls of the temple
  • Some debris has been observed accumulating in one corner of the Lion Temple
  • The corner of the Panorama is broken
  • The sign structures are in good condition
  • No burning activity observed

Suggestions:

  • Plastering of the Lion Temple’s wall, could be carried out before the winter
  • Cleaning the paths and the tracks
  • More attention to the panels, and reordering them based on the observations from the website
  • Repairing the damaged panorama and the iron fence surrounding the excavations

Photographs:

1. Overview
2. Checking
for erosion
3. Inspecting
plaster
4. Checking
for weed removal
5. Inspecting
paths





Back to top: Temple BA

3. August 31, 2025

Observations:

  • No weeds.
  • No erosion on the walls of the temple
  • The sign structures are in good condition
  • No burning activity observed
  • Pathways are clean except for one

Photographs:

1. Overview
2. Checking
for erosion
3. Inspecting
plaster
4. Checking
for weed removal
5. Inspecting
paths





Back to top: Temple BA

4. September 15, 2025

Observations:

  • No weeds.
  • No erosion on the walls of the temple
  • The sign structures are in good condition
  • No burning activity observed
  • Pathways are clean

Photographs:

1. Overview
2. Checking
for erosion
3. Inspecting
plaster
4. Checking
for weed removal
5. Inspecting
paths





Back to top: Temple BA

5. September 30, 2025

Observations:

  • The overall condition is good

Photographs:

1. Overview
2. Checking
for erosion
3. Inspecting
plaster
4. Checking
for weed removal
5. Inspecting
paths





Back to top: Temple BA

6. October 15, 2025

Observations:

  • The overall condition is good, except for Wall C2-3, which is very crumbly. I am going to assess all the palace walls soon.
  • The tannur cover and sewage cover have been repaired, I will send you a detailed report on the metal works soon.
  • The protective systems are currently being plastered.

Suggestions:

  • Is it possible to unify the color of the panorama on site to either white or blue?

Photographs:

1. Overview
2. Checking
for erosion
3. Inspecting
plaster
4. Checking
for weed removal
5. Inspecting
paths





Back to top: Temple BA

7. October 31, 2025

Observations:

  • There are no observations to report in the temple area, no weeds or burning activity.
  • I would like to note that mortar will be applied between the stones on the staircase and in other areas soon.
  • The panorama also requires repainting, as mentioned in the previous report, and some of the cement blocks forming the pathways need to be renewed as well.
  • All of this work will be carried out after the completion of plastering on the protective systems in the palace area



Photographs:

1. Overview
2. Checking
for erosion
3. Inspecting
plaster
4. Checking
for weed removal
5. Inspecting
paths





Back to top: Temple BA

Synopsis

1. Overview
2. Checking
for erosion
3. Inspecting
plaster
4. Checking
for weed removal
5. Inspecting
paths
1

Aug. 6,
2025





2

Aug. 15,
2025







3

Aug. 31
2025





4

Sep. 15
2025





5

Sep. 30
2025





6

Oct. 15
2025





7

Oct. 31
2025