Roster |
Date |
Author |
Record |
Daily notes about recovery of elements |
2005-08-14 |
cvp |
The excavation of the column has already reached the level left in MZ16. We separated the Column space (k106) with a string. [Input: P810CVP.j] |
2005-08-15 |
cvp |
Second part of E section photographed (v77) and drawn. E baulk begins to be removed. We left temporarily the excavation of k106 (the column), to concentrate in the rest of the square, as are now in the same elevation, basically due to strategic reasons (access to the "elevatore" to remove the dirt). We use also the same number for that big multilayered feature, f151. [Input: P810CVP.j] |
2005-08-16 |
cvp |
We are still digging the same feature as yesterday. [Input: P810CVP.j] |
2005-08-17 |
cvp |
Keep digging looking for the bottom of the MZ16 squares. [Input: P817CVP.j] |
2005-08-18 |
cvp |
Finishing here for the time being, as we have arrived at the level left in MZ16 (9022). We took photos (v86, v86a), relay and made a sketch (J01sk33) of the floating stones. [Input: P817CVP.j] |
Roster |
Date |
Author |
Record |
Elements within locus |
2005-08-17 |
vS |
f162 (accumulation D) [Input: P907MS1.j] |
2005-08-18 |
vS |
f167 (isolated stone), f168 (wall), f169 (isolated stone), f170 (isolated stone) [Input: P907MS1.j] |
2005-08-02 |
cVP |
q290 (pottery) [Input: U817LH12.j] |
2005-08-04 |
jE |
q310 (pottery) [Input: P808JE1.j] |
2005-08-15 |
pC |
q389 (pottery), q390 (bones, pottery), q391 (pottery), q392 (pottery) [Input: P815JE.j] |
2005-08-16 |
vS |
q393 (pottery), q394 (bones, pottery) [Input: P816JE2.j] |
2005-08-17 |
vS |
q398 (pottery), q405 (pottery) [Input: P821CVP.j] |
2005-08-18 |
pC |
q408 (bones, pottery) [Input: P821CVP.j] |
Extension of locus or q-lot |
2005-08-02 |
vS |
m3946 [Input: P807VS.j] |
Length of two sides |
2005-08-02 |
vS |
150s [Input: P807VS.j] |
2005-08-02 |
vS |
430w [Input: P807VS.j] |