Strategy (projected or implemented) |
2010-08-07 |
cJC |
After f44 had been excavated k3 was cut back one meter from the inside of trench k200. No features were assigned to that cleaning operation but ash and brickfall were seen in section. These are not assigned to f44, but rather were assigned feature numbers (f57 and f58) during the study season. They are directly below f44 although they were only exposed, not excavated. [Input: U807CJC.j] |