Conservation (Version 1)

The data. Monitoring

Inspections

Giorgio Buccellati – November 2025

Monitoring is performed on a regular basis. They are documented separately for each major excavation area, as follows:

  1. The Temple BA
  2. Monumental staircase
  3. Plaza
  4. Abi
  5. Palace
  6. Above palace

For the first five inspections, a .PDF version of the check list is available, and links are given below.

For all inspections, the data are distributed in the six files matching the six areas given above.

The inspection sequential list is as follows:

  1. August 6, 2025
  2. August 15, 2025
  3. August 31, 2025
  4. September 15, 2025
  5. September 30, 2025
  6. October 1, 2025
  7. October 31, 2025
  8. November 15, 2025