Conservation (Version 1)

The data. Monitoring

Inspections

Amer Ahmad – November 2025

Monitoring is performed on a regular basis. They are documented separately for each major excavation area, as follows:

  1. The Temple BA
  2. Monumental staircase
  3. Plaza
  4. Abi
  5. Palace
  6. Above palace

For the first five inspections, a .PDF version of the check list is available, and links are given below.

For all inspections, the data are distributed in the six files matching the six areas given above.

The inspection sequential list is as follows:

  1. August 6, 2025 (3,840 KB)
  2. August 15, 2025 (4,138 KB)
  3. August 31, 2025 (3,592 KB)
  4. September 15, 2025 (3,499 KB)
  5. September 30, 2025 (3,050 KB)
  6. October 15, 2025 (3,453 KB)
  7. October 31, 2025 (3.214 KB)
  8. November 15, 2025 (3,036 KB)
  9. November 30, 2025 3,186 KB)
  10. December 30, 2025 (2,928 KB)
  11. February 01, 2026 (3,599 KB)
  12. February 28, 2026 (3,614 KB)
  13. March 31, 2026 (3,769 KB)
  14. April 30, 2026 (4,081 KB)
  15. May 31, 2026 (3,733 KB)
  16. June 30, 2026 (3,990 KB)

Back to top: Inspections