https://urkesh.org/MZ/A/A09/D/X/XF/DF1-FA.htm

Unit Book A9

Typological index with Frequency Computations
Installations and deposits
by definition

Processed on 2024-07-27
Included here are stationary elements or features, which can be divided into
Click on column headers to change sort order.


Definition Total Percentage Histogram
accumulation 70 18%
accumulation B 1 0%
accumulation C 10 3%
accumulation D 4 1%
backfill1 3 1%
brick installation 10 3%
brick scatter 2 1%
brickfall 1 0%
burial 15 4%
conflation of floors 1 0%
cut 2 1%
doorway 7 2%
fill 19 5%
floor, type a 4 1%
floor, type b 5 1%
floor, type c 5 1%
floorsurface in general 6 2%
foundation 7 2%
group of bricks 16 4%
group of stones 3 1%
installation 4 1%
laminations 1 0%
layer 22 6%
lens 1 0%
lens type b 1 0%
lens type c 12 3%
mixed features 3 1%
pavement 6 2%
pavement, type b 9 2%
pavement, type c 5 1%
pit 21 5%
pit cut 4 1%
platform 4 1%
rodent hole 1 0%
room 3 1%
soil within feature 2 1%
stone installation 4 1%
structure 1 0%
tannur 6 2%
tannur (feature) 9 2%
topsoil 21 5%
trench, trough 1 0%
volumetric material 8 2%
wall 44 11%
working surface 1 0%
Total 385 100%

accumulation B




Total: 1

brickfall




Total: 1

cut




Total: 2

laminations




Total: 1

lens




Total: 1

lens type b




Total: 1

rodent hole




Total: 1

room




Total: 3

structure




Total: 1

trench, trough




Total: 1

working surface




Total: 1