6. REFERENCE
Analogical Record
Roster | Date | Author | Record |
---|---|---|---|
Template | |||
Photo of context (v view) | |||
View/drawing of aggregate | 2008-08-19 | sE | a2 (brick installation) [Input: S828LC.j] |
View/drawing of features | 2008-08-19 | sE | f40 (wall), f56 (brick pile), f125 (wall) [Input: S828LC.j] |
View/drawing of locus | 2008-08-19 | sE | k14, k15 [Input: S828LC.j] |
View/drawing orientation | 2008-08-19 | sE | looking northwest [Input: S828LC.j] |
Text description of view | 2008-08-19 | sE | View showing the a2 after the removal of some mud bricks on top of the structure. The shot also shows the top of the wall f127, after the removal of the first few vertical bricks from the south section of a2, following the strategy decided before, to start from the south, instead that from the top, in order to have a clear section of the structure. [Input: S828LC.j] |
Web view | |||
Photo of view |