OH02-strategy

File: /MZ/A/OH02/D/-INC/SG.HTM
Processed on 08-25-2016
The home for this page is OH02

1998-7-5jW A number of workmen will be available over the next week or so until the excavations near the temple by the German archaeological team begin. We plan to deploy 16 of them to rapidly excavate the square under the supervision of Abdul Kareem. The work will be monitored by jW and jL, who will periodically visit the site, evaluate progress, assign feature numbers and examine artifactual material. A separate book (OH2) has been assigned and will be maintained by jW and jL. We expect to reach the 3 meter level in 4 or 5 workdays. [Input file: I706JLW.J / I706JLW.-J]
1998-7-5jW tomorrow (I707) we plan to first clean and straighten the baulk line, particularly on the north side, then accelerate the pace of the digging. We can do this because of the relative sterility of the soil. If evidence of occupation is found we will slow the pace to explore the evidence. [Input file: I706JLW.J / I706JLW.-J]
1998-7-5gB We plan to work with the big pick and to scrape and clear the surfaces every meter or so, changing of course if we find a different stratigraphic situation. [Input file: I707GB.J / I707GB.-J]
1998-7-9gB we started sifting selectively, for areas with greater concentrations of sealings,with screens 2 mm thick. [Input file: I709JLW.J / I709JLW.-J]
1998-7-11jW continue to excavate across the entire locus with small picks. Be alert to the possibility of containment, either vertically or horizontally. Scrape the entire locus following dirt removal. being prepared to screen if necessary. Confirm relative positions of markers and corners of the squares since the latter are being loosened as the work progresses. [Input file: I711JLW.J / I711JLW.-J]
1998-7-12jW excavate in north half of square to depth of 50 cm. [Input file: I712JLW.J / I712JLW.-J]
1998-7-14jW with the arrival of the team of German archaeologists, the focus of excavations will shift to Area BA. The excavation work here is finished. Tomorrow morning jW and jL will draw the sections of the west and north baulks. At some time thereafter, the features will be labeled, the surfaces will be covered with plastic and the excavation will be covered with the backdirt. [Input file: I714JLW.J / I714JLW.-J]
1998-7-15jW complete data entry on all files. Archive, then meet with gB to identify remaining items to complete global record. Use Photoshop to prepare baulk sections in final form. [Input file: I715JLW.J / I715JLW.-J]