https://urkesh.org/MZ/A/A16/D/X/XF/DF2-FA.htm

Unit Book A16

The Courtyard of the Tupkish Palace (Version 2, Beta release)

Typological index with Frequency Computations
Installations and deposits
typologically by definition

Processed on 2026-09-11
Included here are stationary elements or features, which can be divided into
The main typological categories (surfaces, build-up, etc.) are listed according to types as defined in the pertinent section of the Grammar.


Category Total Percentage Definitions Sub-Total Percentage
buildup 164 48% accumulation 32 20%
accumulation A 14 9%
accumulation B 4 2%
accumulation C 21 13%
accumulation D 1 1%
band 1 1%
layer 82 50%
lens type a 1 1%
topsoil 8 5%
fill, dumping, collapse 57 17% brickfall 14 25%
fill 42 74%
fill in primary context 1 2%
installation 86 25% brick pile 1 1%
burial 2 2%
drain 2 2%
installation 7 8%
isolated individual brick 1 1%
isolated stone 3 3%
pit 23 27%
platform 1 1%
structure 1 1%
tannur 4 5%
wall 41 48%
other features 5 1% hole 2 40%
rodent hole 1 20%
volumetric material 2 40%
stone installation 1 0% stone foundation 1 100%
surface 25 7% floor 1 4%
floor, type a 6 24%
floor, type b 1 4%
floor, type c 8 32%
pavement 6 24%
pavement, type b 3 12%
varia 2 1% various 2 100%
Total 340 100%

buildup > band




Total: 1

varia




Total: 2