- installations that are set in place intentionally, and appear as either horizontal surfaces or as ordered aggregation, and
- deposits that can result either from either layering or buildup, or else from an amorphous amassment.
The main typological categories (surfaces, build-up, etc.) are listed according to types as defined in the pertinent section of the Grammar.
| Category | Total | Percentage | Definitions | Sub-Total | Percentage |
|---|---|---|---|---|---|
| buildup | 79 | 37% | accumulation | 9 | 11% |
| accumulation A | 8 | 10% | |||
| accumulation B | 4 | 5% | |||
| accumulation C | 7 | 9% | |||
| accumulation D | 8 | 10% | |||
| layer | 26 | 33% | |||
| lens | 3 | 4% | |||
| topsoil | 14 | 18% | |||
| fill, dumping, collapse | 18 | 8% | brickfall | 7 | 39% |
| fill | 11 | 61% | |||
| installation | 77 | 36% | bin | 1 | 1% |
| brick installation | 1 | 1% | |||
| brick pile | 2 | 3% | |||
| cut | 1 | 1% | |||
| hearth | 1 | 1% | |||
| installation | 6 | 8% | |||
| isolated individual brick | 1 | 1% | |||
| isolated stone | 2 | 3% | |||
| pit cut | 2 | 3% | |||
| room | 4 | 5% | |||
| stone installation | 15 | 19% | |||
| tannur (feature) | 2 | 3% | |||
| wall | 39 | 51% | |||
| other features | 4 | 2% | volumetric material | 4 | 100% |
| surface | 37 | 17% | floor, type a | 1 | 3% |
| floor, type b | 10 | 27% | |||
| floor, type c | 1 | 3% | |||
| pavement, type b | 6 | 16% | |||
| pavement, type c | 19 | 51% | |||
| Total | 215 | 100% | |||