2. IDENTIFICATION
Designation
Roster | Date | Author | Record |
---|---|---|---|
Description (summary) | 2001-07-12 | ci | This drawing shows the south baulk of k27 after we had cleared away the accumulated mud in the bottom of the locus. The square indentations in the section are the locations of the first set of soil samples which we removed and sent to lc in Italy for thin-sectioning. Because these samples did not survive the trip intact, we cut another set of samples at the end of the season, after we had cut the baulk face back half of a meter. The dotted line at the bottom of the drawing is the excavation line. Together with w30, it forms the composite drawing w32, a section of the entire southern baulk of building W. [Input: M719JL.j] |
6. REFERENCE
Analogical Record
Roster | Date | Author | Record |
---|---|---|---|
View/drawing of features | 2001-07-12 | ci | f258 (accumulation C), f259 (accumulation C), f303 (installation), f304 (accumulation), f305 (accumulation), f306 (accumulation), f316 (accumulation), f324 (accumulation C), f326 (wall), f329 (accumulation), f331 (accumulation C), f343 (accumulation A), f347 (accumulation A), f351 (accumulation) [Input: M719JL.j] |
View/drawing of locus | 2001-07-12 | ci | k26, k27 [Input: M719JL.j] |
View/drawing orientation | 2001-07-12 | ci | looking south [Input: M719JL.j] |