1. OVERVIEW
Roster | Date | Author | Record |
---|---|---|---|
Category | !! | !! | installation |
Best definition | 2004-09-11 | jw | installation [Input: O911JW.j] |
Best image | 2004-07-05 | !! | v132 [Input: O911JW2.j] |
2. IDENTIFICATION
Designation
Roster | Date | Author | Record |
---|---|---|---|
Description (summary) | 2004-09-11 | jw | Two parallel structures with rectangular cross-section, approximately one meter long each, running N-S and separated by a gap of about 50cm.. The western one (f211) was built of at least 3 courses of gray brick as seen in section, while the eastern one may have been pise. The function could not be determined. [Input: O911JW.j] |
3. STRATIGRAPHY
Volumetric Localization
Roster | Date | Author | Record |
---|---|---|---|
Locus | 2004-09-11 | jw | k4 [Input: O911JW.j] |
Spatial Aggregation
Roster | Date | Author | Record |
---|---|---|---|
Features within aggregate | 2004-09-11 | jw | f211 (wall), f222 (wall) [Input: O911JW.j] |
Time Sequencing
Roster | Date | Author | Record |
---|---|---|---|
Stratum (to which element belongs) | 2004-08-24 | !! | s50JPA [Input: O824JW.j] |
Phase (to which element belongs) | 2004-08-24 | !! | h3JPA [Input: O824JW.j] |
2004-08-24 | !! | h3bJPA [Input: O824JW.j] |