Date | Author | Record | |
---|---|---|---|
2005-08-27 | mS | had a discussion with gB, fAB, pC, vS and mS on how best to remove the dirt now that we are getting lower and lower in each of the loci. We will move the elevator after work to the north section over the stones of the wall, f72. [Input: P828MS1.j] | |
2005-09-01 | mS | moved the elevator to the west about a meter and got a new sifter which should make dirt removal go faster. [Input: P901MS.j] | |
2006-08-31 | mS | The second shafat began to be used so we now have two. We will install a third on Saturday along the terrace to aid in dirt removal in this area. [Input: Q824MS.j] | |
2008-08-17 | rE | Due to the little amount of dirt we have, gB suggested to move the two shaffats to J7. [Input: S813RE.j] |