J3w11

File: /MZ/A/J03/D/I//MZ/A/J03/D/W/0011.HTM
Processed on 3-13-2021
The home for this page is J3

Labeling/Designation

Description/Count
description (summary) 2007-5-20 jW Drawing of the section of the north baulk of k21 prior to its removal in order to expand the excavation north to incorporate the south half of k22 into a new locus, k108. The top two features, f126 and f129 were excavated several years ago as part of unit J2. Excavation this year started with k98 and k103. All four features are natural accumulations/topsoil most likely built up after the last significant occupation. [Input File: R520jW.j]

Analogical Record
view/drawing orientation 2007-5-20 jW looking north [Input File: R520jW.j]
drawing of indiv. element (studio)
17-2-2021 / !!! / [Input File:J03_VWX.j]
constituents within view/drawing 2007-5-20 jW f98 f103 f126 f129 k21 [Input File: R520jW.j]