Daily notes about recovery of elements |
2008-08-25 |
lC |
today we removed the accumulation f120, south of the mud brick wall f126, uncovering the floor f144. Tomorrow we will take photos of f144 and then we will excavate the floor trying to go down to the level of the stone pavement f108, to understand the link between it and the pavement f132. [Input: S825LC.j] |