- installations that are set in place intentionally, and appear as either horizontal surfaces or as ordered aggregation, and
- deposits that can result either from either layering or buildup, or else from an amorphous amassment.
The main typological categories (surfaces, build-up, etc.) are listed according to types as defined in the pertinent section of the Grammar.
Category | Total | Percentage | Definitions | Sub-Total | Percentage |
---|---|---|---|---|---|
buildup | 79 | 37% | accumulation | 9 | 11% |
accumulation A | 8 | 10% | |||
accumulation B | 4 | 5% | |||
accumulation C | 7 | 9% | |||
accumulation D | 8 | 10% | |||
layer | 26 | 33% | |||
lens | 3 | 4% | |||
topsoil | 14 | 18% | |||
fill, dumping, collapse | 18 | 8% | brickfall | 7 | 39% |
fill | 11 | 61% | |||
installation | 77 | 36% | bin | 1 | 1% |
brick installation | 1 | 1% | |||
brick pile | 2 | 3% | |||
cut | 1 | 1% | |||
hearth | 1 | 1% | |||
installation | 6 | 8% | |||
isolated individual brick | 1 | 1% | |||
isolated stone | 2 | 3% | |||
pit cut | 2 | 3% | |||
room | 4 | 5% | |||
stone installation | 15 | 19% | |||
tannur (feature) | 2 | 3% | |||
wall | 39 | 51% | |||
other features | 4 | 2% | volumetric material | 4 | 100% |
surface | 37 | 17% | floor, type a | 1 | 3% |
floor, type b | 10 | 27% | |||
floor, type c | 1 | 3% | |||
pavement, type b | 6 | 16% | |||
pavement, type c | 19 | 51% | |||
Total | 215 | 100% |