https://urkesh.org/MZ/A/A20/D/X/XF/DF2-FA.htm

Unit Book A20

The eastern sector of the Palace - Version 1a

Typological index with Frequency Computations
Installations and deposits
typologically by definition

Processed on 2024-11-15
Included here are stationary elements or features, which can be divided into
The main typological categories (surfaces, build-up, etc.) are listed according to types as defined in the pertinent section of the Grammar.


Category Total Percentage Definitions Sub-Total Percentage
buildup 79 37% accumulation 9 11%
accumulation A 8 10%
accumulation B 4 5%
accumulation C 7 9%
accumulation D 8 10%
layer 26 33%
lens 3 4%
topsoil 14 18%
fill, dumping, collapse 18 8% brickfall 7 39%
fill 11 61%
installation 77 36% bin 1 1%
brick installation 1 1%
brick pile 2 3%
cut 1 1%
hearth 1 1%
installation 6 8%
isolated individual brick 1 1%
isolated stone 2 3%
pit cut 2 3%
room 4 5%
stone installation 15 19%
tannur (feature) 2 3%
wall 39 51%
other features 4 2% volumetric material 4 100%
surface 37 17% floor, type a 1 3%
floor, type b 10 27%
floor, type c 1 3%
pavement, type b 6 16%
pavement, type c 19 51%
Total 215 100%