https://urkesh.org/MZ/A/J04/D/H/085-MZA.htm

Unit Book J4

J4h85MZA

Processed on 2024-09-12

2. IDENTIFICATION

Designation

Roster Date Author Record
Definition 2010-02-12 sC Build-up of tell [Input: U212SC2.j]
Description (summary) 2010-02-12 sC In J04 area, Phase 85-MZA is related with the upper layers, such as the topsoil and the layers below the toposil which are mainly wind and water-born accumulations: these natural accumulations, contribuited to the build-up of the tell mound for aproximately 1 meter in depth. The build-up of the tell mound, as visibile in the long N-S section of J04 unit (cfr. v32 and related subviews), is in total aproximately 2 meter deep, but only the first meter is related with Phase 85-MZA. This phase comprehends different strata that represent the different events that took place within J04 unit in this phase. These, are the following: s1, is related with the accumulations that build-up between different excavation seasons, s2 is related with the topsoil layers and the layers below the toposoil (including also layers related with tell surface wash and erosion), s3 concerns the upper layers with evidence of scattered occupation s5, is related with natural accumulations that build-up the tell surface below s3, and s5a is instead related with the erosion of the natural accumulations belonging to s5. Within all these accumulations, several pottery sherds and q-items were recovered (mostly within s5) toghether with isolated limestones (mainly within layers belonging to s5a). The presence of this material, however, is not related with human activity within this area of the tell mound in this time period, at least for what concerns J04 unit, but with the erosion of the tell surface. At present (i.e., as the results of the 2006 excavation season in J04 unit indicate) there are no evidence of activities carried out within J04 unit in Phase 85-MZA. [Input: U212SC2.j]

3. STRATIGRAPHY

Recovery/Assignment

Roster Date Author Record
Notes on recovery 2010-02-12 sC The build-up of the tell surface, as already mentioned, is almost 2 meter deep; this is clearly visibile in the long N-S section of J04 unit (cfr. v32 and related subviews). The pottery sherds recovered -while removing the accumulations that build-up the tell mound- allowed us to assigne the layers belonging to the first meter of accumulation (corresponding to stratum s5 and its substraum s5a) to Phase 85-MZA, and those found within the meter below (relative to stratum s12 and its substraum, s12a) to Phase 67-MZA. [Input: U212SC2.j]

Time Sequencing

Roster Date Author Record
Strata (included within phase) 2010-02-12 sC s1MZA [Input: U212SC2.j]
2010-02-12 sC s2MZA [Input: U212SC2.j]
2010-02-12 sC s2aMZA (Erosion of Tell) [Input: U212SC2.j]
2010-02-12 sC s3MZA [Input: U212SC2.j]
2010-02-12 sC s5MZA (Build-up of tell) [Input: U212SC2.j]
2010-02-12 sC s5aMZA (Erosion of Tell) [Input: U212SC2.j]