https://urkesh.org/MZ/A/A07/D/X/XF/DF2-FA.htm

Unit Book A7

The western portion of the service courtyard (Version 1, Beta release)

Typological index with Frequency Computations
Installations and deposits
typologically by definition

Processed on 2025-03-25
Included here are stationary elements or features, which can be divided into
The main typological categories (surfaces, build-up, etc.) are listed according to types as defined in the pertinent section of the Grammar.


Category Total Percentage Definitions Sub-Total Percentage
buildup 12 48% accumulation 3 25%
accumulation A 1 8%
accumulation B 1 8%
accumulation C 4 33%
topsoil 3 25%
fill, dumping, collapse 2 8% fill 2 100%
installation 6 24% isolated individual brick 1 17%
pit 1 17%
wall 4 67%
surface 5 20% floor, type b 1 20%
floor, type c 1 20%
floor, type d 2 40%
floorsurface in general 1 20%
Total 25 100%