https://urkesh.org/MZ/A/J01/D/X/XF/DF2-FA.htm

Unit Book J1

Typological index with Frequency Computations
Installations and deposits
typologically by definition

Processed on 2024-07-27
Included here are stationary elements or features, which can be divided into
The main typological categories (surfaces, build-up, etc.) are listed according to types as defined in the pertinent section of the Grammar.


Category Total Percentage Definitions Sub-Total Percentage
buildup 156 58% accumulation 9 6%
accumulation A 1 1%
accumulation B 10 6%
accumulation C 13 8%
accumulation D 90 58%
laminations 1 1%
layer 1 1%
lens 3 2%
lens type b 5 3%
lens type d 1 1%
topsoil 22 14%
clay artifact 1 0% early escarpment 2 200%
fill, dumping, collapse 22 8% collapse 4 18%
fill 18 82%
installation 64 24% bench 1 2%
cut 4 6%
hearth 1 2%
installation 8 12%
isolated stone 28 44%
pit 3 5%
stone installation 5 8%
wall 14 22%
other features 4 1% volumetric material 4 100%
surface 23 9% floor, type b 9 39%
floor, type c 1 4%
floor, type d 2 9%
pavement, type b 2 9%
pavement, type c 9 39%
Total 270 100%

accumulation A




Total: 1

laminations




Total: 1

layer




Total: 1

lens




Total: 3

lens type d




Total: 1

clay artifact




Total: 1

bench




Total: 1

hearth




Total: 1

pit




Total: 3

floor, type c




Total: 1