https://urkesh.org/MZ/A/J05/D/S/128-J5B.htm

Unit Book J5

The Mittani Staircase - Version 1a

J5s128J5B

Processed on 2024-11-03

2. IDENTIFICATION

Designation

Roster Date Author Record
Description (summary) 2012-10-16 jW Remodeling of entrance [Input: WX16JW.j]

3. STRATIGRAPHY

Time Sequencing

Roster Date Author Record
Features included within stratum 2012-10-16 jW f45 (floor, type b), f58 (accumulation A), f60 (floor, type b), f97 (accumulation D), f101 (volumetric material), f152 (isolated stone), f192 (stone installation) [Input: WX16JW.j]
Phase (to which element belongs) 2012-10-16 jW h7vJ5B [Input: WX16JW.j]