Date Author Record
2010-09-13 pC First day of excavation in B7. We started digging with 2 workmen (1 pickmen and a showel). We dig only in k100. Removed first 40 cm of toposoil f3 and brick crumble f4 [Input: U912PC2.J]
2010-09-14 pC Today we cleaned the Trench k200 which was excavated in 2000. Since it was exposed for 10 years and was never backfilled we found a lot of earth collapsed into the trench, which we named f6. we started excavating in k101 [Input: U912PC2.J]
2010-09-15 pC Today we continued excavating in k101, exposing floor f9. We continued also removing topsoil f6 in k200 in the southern portion of k200, east of k101, exposing mudbricks f10. There are still a lot of plastic bags in f6. Today during the meeting with fAB, gB and mKB, we were thinking of what could be wall f2 and fAB had the idea that it could be a path leading to the temple BA. pC thinks that it could be a terracing wall. [Input: U912PC2.J]
2010-09-16 pC During the meeting with fAB, gB and mKB we decided to continue digging in B7 for another day. We want to expose all f10 in k101 and see if staircase f19 continues down [Input: U912PC2.J]