https://urkesh.org/MZ/A/B07/D/K/0100.htm

Unit Book B7

B7k100

Processed on 2025-11-27

2. IDENTIFICATION

Designation

Roster Date Author Record
Description (summary) 2010-09-13 pC A locus defined by m6336, m6332, m6333, m6337. 3 m to the north and 2 m to the east from m6333. k100 is a small locus to see if wall f1 continues to the east [Input: U912PC2.J]

3. STRATIGRAPHY

Recovery/Assignment

Roster Date Author Record
Daily notes about recovery of elements 2010-09-13 pC Today we started digging in k100. Topsoil f3 covers collapse f4, which covers a surface f5. No particular finds today in terms of architecture or objects. We stop excavating here because we did not found the eastern continuation of f1 [Input: U912PC2.J]

Volumetric Localization

Roster Date Author Record
Elements within locus 2010-09-13 pC f1 (wall)
f2 (wall)
f3 (topsoil)
f4 (collapse)
f5 (floor, type d)
q1 (pottery)
q2 (pottery) [Input: U913PC.J]

6. REFERENCE

Analogical Record

Roster Date Author Record
View/drawing of locus

v1
2010-09-12 pC [Input: U928PC.J]

v2
2010-09-12 pC [Input: U928PC.J]

v3
2010-09-13 pC [Input: U928PC.J]

v4
2010-09-14 pC [Input: U928PC.J]

v4a
2010-09-14 pC [Input: U928PC.J]

v5
2010-09-15 pC [Input: U928PC.J]

v6
2010-09-15 pC [Input: U928PC.J]

v7
2010-09-15 pC [Input: U928PC.J]

v8
2010-09-15 pC [Input: U928PC.J]

v9
2010-09-15 pC [Input: U928PC.J]

v10a
2010-09-15 pC [Input: U928PC.J]

v10b
2010-09-15 pC [Input: U928PC.J]

v13
2010-09-18 pC [Input: U928PC.J]

v13a
2010-09-18 pC [Input: U928PC.J]

v13b
2010-09-18 pC [Input: U928PC.J]

v14
2010-09-18 pC [Input: U928PC.J]

v15
2010-09-18 pC [Input: U928PC.J]

v17
2010-09-18 pC [Input: U928PC.J]