https://urkesh.org/MZ/A/A09/D/X/XF/DF2-FA.htm

Unit Book A9

Version 1a)

Typological index with Frequency Computations
Installations and deposits
typologically by definition

Processed on 2026-09-15
Included here are stationary elements or features, which can be divided into
The main typological categories (surfaces, build-up, etc.) are listed according to types as defined in the pertinent section of the Grammar.


Category Total Percentage Definitions Sub-Total Percentage
buildup 145 45% accumulation 70 48%
accumulation B 1 1%
accumulation C 10 7%
accumulation D 4 3%
brick scatter 2 1%
laminations 1 1%
layer 22 15%
lens 1 1%
lens type b 1 1%
lens type c 12 8%
topsoil 21 14%
fill, dumping, collapse 20 6% brickfall 1 5%
fill 19 95%
installation 105 33% brick installation 10 10%
burial 5 5%
cut 2 2%
doorway 2 2%
foundation 7 7%
installation 3 3%
pit 12 11%
pit cut 4 4%
platform 3 3%
stone installation 4 4%
tannur 9 9%
trench, trough 1 1%
wall 43 41%
other features 9 3% rodent hole 1 11%
volumetric material 8 89%
surface 40 13% floor 6 15%
floor, type a 4 10%
floor, type b 5 12%
floor, type c 5 12%
pavement 6 15%
pavement, type b 9 22%
pavement, type c 5 12%
Total 319 100%

buildup > lens




Total: 1