https://urkesh.org/MZ/A/J05/D/S/650b-J5B.htm

Unit Book J5

The Mittani Staircase - Version 1a

J5s650bJ5B

Processed on 2024-11-03

2. IDENTIFICATION

Designation

Roster Date Author Record
Description (summary) 2012-10-16 jW Construction of SE revetment wall [Input: WX16JW.j]

3. STRATIGRAPHY

Time Sequencing

Roster Date Author Record
Features included within stratum 2012-10-16 jW f4 (stone installation), f6 (stone installation), f165 (accumulation D), f166 (accumulation D), f170 (accumulation D), f171 (accumulation D), f175 (accumulation D), f176 (accumulation D), f177 (accumulation D), f178 (accumulation D), f179 (accumulation D), f182 (accumulation D), f183 (accumulation D), f185 (glacis), f186 (wall), f189 (wall), f196 (pavement, type b), f198 (stone installation), f199 (stone installation), f248 (accumulation D) [Input: WX16JW.j]
Phase (to which element belongs) 2012-10-16 jW h3mJ5B [Input: WX16JW.j]