2. IDENTIFICATION
Designation
Roster | Date | Author | Record |
---|---|---|---|
Description (summary) | 2010-07-29 | pC | Early EDIII. Major construction and remodeling of the temple terrace. It is during this time that the revetment wall and monumental staircase are built. [Input: U729PC.J] |
2010-07-29 | pC | Construction of staircase and revetment wall [Input: U815PC.J] |
3. STRATIGRAPHY
Time Sequencing
Roster | Date | Author | Record |
---|---|---|---|
Features included within stratum | 2010-07-29 | pC | f24 (wall) f27 (wall) f99 (wall) f100 (isolated stone) f129 (wall) f130 (wall) f177 (isolated stone) f218 (wall) f219 (wall) f227 (wall) f255 (staircase) f300 (layer) [Input: U815PC.J] |
Phase (to which element belongs) | 2010-07-29 | pC | h3mJ6A [Input: U815PC.J] |