Description | 2006-8-12 | cVP | New square opened south of last year k12. [Input file: Q812CVP.J / Q812CVP.-J] |
2006-8-12 | mL | excavation unit triangular area [Input file: Q829MS1.J / Q829MS1.-J] |
Daily | 2006-8-12 | cVP | As we just need the eastern triangle, we just open that, doing the relays to locate it and giving a new feature number for the topsoil, f199. [Input file: Q812CVP.J / Q812CVP.-J] |
2006-8-13 | cVP | Yesterday we dug the topsoil and today we are digging the accumulation below topsoil, f200. As we have not yet bP points we are working with the strings set by ourselves. [Input file: Q812CVP.J / Q812CVP.-J] | |
2006-8-14 | cVP | Digging the accumulation under topsoil f200. [Input file: Q812CVP.J / Q812CVP.-J] | |
2006-8-15 | cVP | Digging the accumulation under topsoil f200. At some 170 cm from the surface we stop digging here so we can draw the sections. All is cleansed and dM do the pictures of the soil and both sections. The staff take the measurements to begin the drawings tomorrow. Here we are deeper than in k3, the moment of harder soil has passed and now we have quite the quantity of rodent holes again. [Input file: Q812CVP.J / Q812CVP.-J] | |
2006-8-16 | cVP | We draw here the N and E section. Afterwards, the team begin to dig the E baulk. We dig the topsoil and the beginning of the accumulation under the topsoil. [Input file: Q812CVP.J / Q812CVP.-J] | |
2006-8-17 | cVP | Still digging the E baulk. [Input file: Q817CVP.J / Q817CVP.-J] | |
2006-8-19 | cVP | Finishing digging the E baulk. ml and lH draw the section of the N baulk in the area occupied by the E baulk of k2, in order to have all the N section of these 2 loci ( k2 and k3) complete. [Input file: Q817CVP.J / Q817CVP.-J] | |
2006-8-20 | cVP | After finishing digging the E baulk we excavate the interior of the locus. Here we have the same different feature of the interface type that we found in k3. As we are in the same level and they are in contact, we use the same feature number for both, f203. In this feature we reach the level of the 1st step (9000 more or less) so we stop and flatten the area, then putting the team to dig the N baulk. [Input file: Q817CVP.J / Q817CVP.-J] | |
2006-8-21 | cVP | Digging the rest of the E baulk. [Input file: Q817CVP.J / Q817CVP.-J] |
Space definition | 2006-8-12 | mL | r406 [Input file: Q829MS1.J / Q829MS1.-J] |
2006-8-12 | mL | r407 [Input file: Q829MS1.J / Q829MS1.-J] | |
2006-8-12 | mL | r408 [Input file: Q829MS1.J / Q829MS1.-J] |
Photo of view | ![]() v129 ![]() v131 ![]() v132 ![]() v133 | ||||||||
Photo of view | ![]() v134 ![]() v145 ![]() v185 ![]() v186 ![]() v186a ![]() v217 ![]() v226 ![]() v226a ![]() v226b | ||||||||
Drawing of view | w34 |
w35 |
w100 |
Reference to Plot | 2007-7-27 | mS | p0034 [Input file: R727MS1.J / R727MS1.-J] |