https://urkesh.org/MZ/A/A15/D/F/0226.htm

Unit Book A15

The Reception Area (Version 1a)

A15f226

Processed on 2024-12-10

2. IDENTIFICATION

Designation

Roster Date Author Record
Definition 2001-08-28 jlw drain [Input: L828jlw1.j]
Description (summary) 2001-08-28 jlw a line of baked bricks laid over a cement floor that serves as a drain for water within portions of the palace building. In this case, the north end, which is shaped like the lower half of a pipe which has been cut longitudinally, immediately penetrates a wall to the south. It emerges to run south in a covered channel, which eventually turns east. [Input: L828jlw1.j]

3. STRATIGRAPHY

Volumetric Localization

Roster Date Author Record
Locus 2001-08-26 ed k93 [Input: ZG114jW.j]
Elevation 2001-08-26 ed 8516 @bottom S [Input: ZG114jW.j]
2001-08-26 ed 8520 @bottom N [Input: ZG114jW.j]
Notes on volumetric localization 2001-08-28 jlw the elevation of the north end is 8520.5, while the elevation of the south end is 8516.5, meaning that the water drained from N to S. Incidentally the elevation of what we believe to be the floor surface surrounding the Phase 2 level of the small well, f145, is also 8516.5. However the link between the two is uncertain, even though they are only separated by a few meters. [Input: L828jlw1.j]

Contact Association

Roster Date Author Record
Type of contact: latest events 2022-01-23 jw f146 (floor, type b) covers f226 (installation) [Input: ZG124jW.j]

Time Sequencing

Roster Date Author Record
Stratum (to which element belongs) 2024-03-13 jW s560A15A [Input: ZI901jW.j]
Phase (to which element belongs) 2024-03-13 !! h4jMZA [Input: ZI901jW.j]